Rear Hub and Long Lead Sensor Discovery 2 Part No. TAY100050L

  • Order online today
  • International delivery available
  • Secure online payment
  • Available:
    This item is available for dispatch.
Now £74.01 exc. VAT
£88.81 inc. VAT
Compatibility:
Shipping Dimensions:
  • Length: 18cm / 180mm
  • Width: 18cm / 180mm
  • Height: 12cm / 120mm
  • Courier Packing Size: 66 box3
  • Weight: 5.56kg
Found a discrepancy? Contact Us

Rear Hub and Long Lead Sensor Discovery 2 TAY100050L

Land Rover recognised that on some Discovery 2 vehicles the wiring from the ABS sensor to the ECU could get damaged. This would result in the vehicle recording ABS faults that cannot be corrected by either a sensor or hub replacement. Their solution was to produce a sensor with a very long lead that bypassed the damaged lead. This hub assembly is a complete unit with this type of ABS sensor and lead.

Long sensor lead

Rear

  • Discovery 2